Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56065 REL 29: 1999-003-01 EXP CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Project Number:
Title:
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Mainstem Dams
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
56065 REL 29
Contract Title:
1999-003-01 EXP CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Contract Continuation:
Previous: Next:
56065 REL 27: 1999-003-01 EXP CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Contract Status:
Closed
Contract Description:
Provide water level data to BPA in chum salmon spawning areas below Bonneville Dam.
Account Type(s):
Expense
Contract Start Date:
10/01/2019
Contract End Date:
12/31/2020
Current Contract Value:
$25,000
Expenditures:
$25,000

* Expenditures data includes accruals and are based on data through 30-Nov-2025.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Accrual Category:
RM&E
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance B: 165. Environmental Compliance 09/30/2020 09/30/2020
Temperature and water surface elevation data C: 157. Collect temperature and water surface elevation data in chum spawning areas 09/30/2020 09/30/2020
Completed Annual Report D: 132. Annual report 09/30/2020 09/30/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Environmental Compliance
C 157 Collect temperature and water surface elevation data in chum spawning areas 01/21/2020
D 132 Annual report
E 119 Manage and Administer Project